
Instant Estimate
Cooling Load Estimator
Estimate the cooling tonnage for your project from area, use, ceiling height, occupancy and solar exposure.
Parameters
Estimated Results
Required Tonnage (TR)
0.0
TR
Cooling kW0.0
Airflow CFM0
sq.m / TR0.0
Suggested System:
Includes a 10% safety margin, based on per-sq.m load density adjusted for height, occupancy and solar exposure. Not a substitute for a detailed HAP / Carrier E20 load study.